Data hall aisle between rows of server racks, with overhead ductwork and cable trays; the racks and services on the right are drawn as a glowing blue wireframe model.

02 / 10

Data Centers

Server halls, white spaces, technical rooms, support areas and critical building infrastructure.

  • Architectural
  • Structural
  • MEPF
  • Coordination
Data center BIM model | Architecture + Structure + MEPFIllustrative composite - does not depict an actual client project.
Overview

Data halls stack cooling, power and cable containment into tight overhead and underfloor zones, and every route has to leave room for maintenance. The model resolves those layers row by row, so equipment can be installed and serviced as drawn.

Layer by Layer

What each discipline models

  1. L.01Architectural

    Room layouts, partitions, doors and access zones.

  2. L.02Structural

    Floor systems, equipment supports and framing.

  3. L.03MEPF

    Cooling, ventilation, power distribution, cable containment, plumbing and fire protection.

  4. L.04Coordination

    Dense overhead services, equipment clearances, maintenance access and routing interfaces.

Typical Challenges

Where these projects go wrong, and how the model prevents it

  1. C.01

    Cooling, power and containment compete for the same overhead space

    Approach

    Each system is given a defined zone and level, then the zones are clash-tested together before any route is fixed.

  2. C.02

    Equipment needs clear space to be installed and maintained

    Approach

    Clearance and access volumes are modeled around equipment, so services that would block maintenance show up as clashes.

  3. C.03

    Support framing has to suit heavy and dense equipment

    Approach

    Floor systems and equipment supports are modeled in the structural model and coordinated against the services they carry.

Coordination Focus
  • Overhead cable containment stacked against cooling and ventilation
  • Equipment clearances in white space and technical rooms
  • Maintenance access to plant and distribution
  • Routing interfaces between halls and support areas
Deliverables
  • Architectural model of halls, technical rooms and access zones
  • Structural model of floor systems and equipment supports
  • Coordinated cooling, power, containment, plumbing and fire protection models
  • Federated model with clash reports and a tracked issue log

Standard modeling capability: up to LOD 400, across every discipline.

LOD & Standards →
How the Work Runs

Process

  1. 01

    Brief & inputs

    Drawings, models, standards and templates collected, with scope agreed by discipline and level of detail.

  2. 02

    Discipline modeling

    Each discipline modeled on the project's shared coordinate system, to your naming and template standards.

  3. 03

    Federation & clash cycles

    Models federated and clash-tested, with issues tracked through resolution with the responsible trades.

  4. 04

    Sign-off & handover

    Issue log closed out and coordinated models and drawings handed over, with a change log.

FAQ

Data Centers: common questions

Yes. Cable tray and containment are part of the MEPF model and are coordinated against cooling, ventilation, plumbing and fire protection.

STRATA models design intent supplied by your architect or engineer of record. We are not the architect or engineer of record on your project, and we do not stamp or seal drawings.

Ready to coordinate your next project?

Send your disciplines, LOD target, and project location. We come back with scope and next steps within 24 business hours.

STRATA BIMSTRATA BIMThe Layers Behind Better Building

STRATA BIM is a specialty BIM modeling and coordination firm serving architects, engineers, general contractors, and owners across architectural, structural, civil, landscape, MEPF, and site utility scopes, delivering up to LOD 400.