BIM Coordination
Architectural, structural, and MEPF models federated in Navisworks and Revizto, clashes detected against the tolerances your project has already adopted, and each hit tracked through to resolution. A clash report only earns its keep when someone closes the loop with the trade responsible, so that is where the scope actually ends.
Clash detection, clash resolution, and MEPF coordination across the federated model.
Process
- 01
Federation
Discipline models assembled on a shared coordinate system into one federated model.
- 02
Clash detection
Tests run against the hard and soft clash tolerances your project has adopted.
- 03
Resolution cycles
Clashes worked through with the responsible trades, tracked in the issue log.
- 04
Sign-off
Issue log closed out, with anything unresolved handed back with location and severity attached.
- General contractors running multi-trade coordination
- MEP engineering firms coordinating against structure and architecture
- Developers and owners wanting one point of coordination
Common questions
Up to LOD 400, the same ceiling as every other core field. Clash resolution checked against fabrication-ready detail catches what a rougher placeholder model leaves for the field to find.
STRATA models design intent supplied by your architect or engineer of record. We are not the architect or engineer of record on your project, and we do not stamp or seal drawings.
Ready to coordinate your next project?
Send your disciplines, LOD target, and project location. We come back with scope and next steps within 24 business hours.